For this phase of development we organize into teams lead by a single surgeon. The role of the team is to give full support to the surgeon and make his work effortless and smooth.

Component Description Surgeon Copilot Assistant Status
consensus Algorithm for blockchain consensus err agg das Progress
zk / crypto ZK compiler and crypto algos par nar Mature
wasm WASM smart contract system par nar xsan Progress
net p2p network protocol code agg xsan nar Mature
blockchain consensus + net + db err das Easy
bridge Develop robust & secure multi-chain bridge architecture par xsan None
tokenomics Research and define DRK tokenomics xeno err nar Starting
util Various utilities and tooling nar xsan das Progress
arch Architecture, project management and integration nar par Progress

Priorities:

  1. Consensus
    1. Settle on final algorithm. Currently fixing the reward function.
    2. Review the contracts
    3. Create the blockchain API
  2. WASM
    1. Update current WASM code
    2. Experiment and draft docs
    3. Begin to implement smart contract subsystem
    4. Migrate dao and otc applications over
  3. util
    1. Simulate event graph subsystem
    2. Create underlying event graph subsystem
    3. Create abstraction layer and APIs
    4. Begin to rewire ircd and taud
    5. Update taud to CRDTs
    6. Q&A on wallet application

Release Cycle

Phase Description Duration Details Version
Dcon0 Research Research new techniques, draft up architecture design documents and modify the specs. During this phase the team looks into new experimental techniques and begins to envision how the product will evolve during the next phase of the cycle. pre-alpha
Dcon1 New features and changes Add big features and merge branches. Risky changes that are likely to cause bugs or additional work must be done before the end of this phase. The first 10 weeks overlap with the Dcon3 & Dcon4 phases of the previous release, and many developers will focus on bug fixing in those first weeks. Developers dedicate a steady 1-2 days/week to the bug tracker, focusing on triaging and newly introduced bugs. alpha
Dcon2 Improve and stabilize Work to improve, optimize and fix bugs in new and existing features. Only smaller and less risky changes, including small features, should be made in this phase. If a new feature is too unstable or incomplete, it will be reverted before the end of this phase. Developers spend 2-3 days/week in the bug tracker, triaging, fixing recently introduced or prioritized module bugs. alpha
Dcon3 Bug fixing only 2 months Focus on bug fixing and getting the release ready. Development moves to the stable stabilizing branch. In master Dcon1 for the next release starts. stable is regularly merged into master. High priority bugs dictate how much time developers will spend in the tracker as oppose to work on the next release Dcon1 features. beta
Dcon4 Prepare release 2 weeks Stable branch is frozen to prepare for the release. Only critical and carefully reviewed bug fixes allowed. Release candidate and release builds are made. Developers spend a short time 5 days/week with an eye in the tracker for any unexpected high priority regression. release candidate
Dcon5 Release 1 week Stage where the final builds are packaged for all platforms, last tweaks to the logs, memes, social media, video announcements. The final switch is flicked on [dark.fi](https://dark.fi/) for the new release to show up on the Download page. release